Before taking on this classic, summer holiday project that had to be completed within a 6-week window, the contractor needed a WC subcontractor they could trust to complete the installation within the agreed timescales.

At Cube Install we were prepared to rally to the challenge and commit to helping out on this fast-paced project.

Brief

The conversion of 2 existing washroom areas into 4 open plan unisex washrooms involved a high level of prestart planning and our team played an integral role in the co-ordination between trades to enable the contract to run smoothly.

Solution

The installation incorporated full height Rise SGL cubicles with additional privacy features and specialist cubicle fittings to prevent the misuse of mobile phones within the toilet cubicles. The use of Pre-framed IPS duct panelling meant that a large proportion of the labour time was spent off-site whilst other trades were progressing and these were finally complimented with our solid surface wash troughs to complete the high-class finish.

Working on a similar project? Send us a message with your requirements

Or call 01692 632000 to speak to one of our expert team

Send us a message