Located in the hub of Birmingham’s city centre,  the 3rd & 4th Floors of the Colmore Gate Building have recently undergone an internal refurbishment.  The fit-out contractor on this project appointed Cube Install as the approved subcontractor to take ownership for the design supply and installation of the commercial washroom package.

Brief

Our fluid approach to this installation enabled us to meet the required features of the clients specification.  This included the need to replicate some nearby washrooms which had been recently renovated and source a matching cross-grained oak veneer.

Solution

Our product solution for these prestigious office washrooms was the flush fronted Duke cubicle range, complete with oak veneered doors and coordinating IPS panelling.  The washroom design was completed with bespoke hinged access vanity units and purpose made Corian vanity tops.